Conveyancing problems

Can I sell a house with missing building regulations certificates?

Can I sell a house with missing building regulations certificates?

Quick answer

Yes, you can usually sell a house with missing building regulations certificates, but your buyer's conveyancer will ask about it. The main options are tracking down the original sign-off, applying to the council for a regularisation certificate, or offering an indemnity insurance policy. The right choice depends on the type of work, how recent it is and the buyer's lender.

On this page
  1. What is a building regulations certificate?
  2. Why buyers and lenders care
  3. Your options as a seller
  4. Choosing the right option
  5. Tips to keep the sale moving
  6. Scotland and Northern Ireland
  7. How we can help

Missing building regulations paperwork is one of the most common queries raised during a house sale. It might be an extension, a loft conversion, a removed wall, new windows or a rewire. The work may be perfectly sound, but without evidence of sign-off your buyer's conveyancer will want to know more.

You can usually still sell. This guide explains why the certificate matters, the options available and how to keep your sale on track.

What is a building regulations certificate?

Building regulations set minimum standards for things like structure, fire safety, insulation, drainage and electrics. When certain work is done, it must be approved by a building control body, which issues a completion certificate once satisfied.

Some work can be self-certified by a registered installer through a competent person scheme. For example, replacement windows, boiler installations and some electrical work are commonly certified this way, and the homeowner receives a certificate from the scheme.

Building regulations are separate from planning permission. A project may need one, both or neither, and your buyer's conveyancer will check both.

Why buyers and lenders care

A missing certificate raises two questions for the buyer:

  • Is the work safe and properly built? Without sign-off, nobody has independently confirmed compliance.
  • Could the council take enforcement action? Local authorities have powers to require non-compliant work to be altered or removed.

The Building Safety Act 2022 extended the time limit for councils to serve a notice requiring non-compliant work to be put right from 12 months to 10 years after completion of the work. This makes the question of sign-off more significant for recent work. Your buyer's conveyancer will consider how old the work is when advising.

Key point: the seller's property information form (TA6) asks about building works and the related approvals. Answer it honestly and, if you are unsure, say so. A misleading answer can lead to a claim after completion.

Your options as a seller

1. Find the original paperwork

Start by checking your own records and contacting the council's building control department, which may hold a copy of the completion certificate or have a record on file. Competent person scheme certificates can often be reissued by the scheme operator. This is the quickest and cheapest fix where the work was in fact signed off.

2. Apply for a regularisation certificate

If the work was never approved, you can apply to the local authority for regularisation, which is retrospective approval. According to GOV.UK's building regulations guidance, this is available from local authority building control only, and only for work carried out after 11 November 1985 (at the time of writing, October 2026).

An inspector will visit and may need to open up parts of the work, for example lifting floorboards or exposing foundations or wiring, to check compliance. If changes are needed, you will have to make them before a certificate is issued. The process can take weeks or months, so it is best started before you market the property.

3. Indemnity insurance

A building regulations indemnity policy is a one-off insurance policy that covers the buyer (and their lender) against financial loss if the council takes enforcement action over the missing approval. It is often quick and relatively inexpensive, and many lenders accept it.

However, it has important limits:

  • it covers loss from enforcement action, not the cost of fixing defects or making the work safe;
  • it is usually invalidated if anyone contacts the council about the work, which is why you may be advised not to approach building control if you are going down the insurance route;
  • insurers may decline or restrict cover for recent work, structural work or work with obvious defects.

4. Reduce the price or offer a retention

Sometimes the buyer's surveyor or lender has concerns that insurance will not answer. You may agree a price reduction, or for some money to be held back on completion until the issue is resolved.

Choosing the right option

SituationUsual starting point
Work was signed off but you lost the paperworkRequest a copy from building control or the scheme operator
Older, minor work with no obvious problemsIndemnity insurance is often acceptable
Recent or structural work, or safety concernsRegularisation, or a specialist report
Buyer's lender refuses insuranceRegularisation or renegotiation

If you are not sure whether work needed approval at all, your conveyancer may suggest checking with a surveyor or the relevant scheme. Some minor works, such as like-for-like repairs, do not need building regulations approval.

Your conveyancer will advise which route is appropriate. The buyer's side also has a say, because their lender must be satisfied.

Tips to keep the sale moving

  • Gather certificates, guarantees and planning documents before you list the property.
  • Raise any gaps with your conveyancer at the start, so they can plan rather than react.
  • Do not contact the council about unapproved work until you have discussed it with your conveyancer.
  • Be open with buyers. Disclosed issues are far easier to resolve than ones discovered late.

You can read more about the sale conveyancing process and other common issues that hold up property transactions. If an indemnity policy is needed, it will appear as a disbursement; see our guide to how conveyancing quotes are itemised.

Scotland and Northern Ireland

Scotland uses a building warrant and completion certificate system, and the Home Report process differs. Northern Ireland has its own building control regime. This guide covers England and Wales.

How we can help

An experienced, regulated conveyancer can help you deal with missing paperwork early. Request a free fixed-fee quote for your sale today.

Frequently asked questions

Is it illegal to sell a house without building regulations approval?

No. It is not illegal to sell, but you must answer the property information form honestly. The buyer's conveyancer will raise enquiries, and you may need to obtain a copy certificate, apply for regularisation or provide indemnity insurance.

Who pays for building regulations indemnity insurance?

It is a matter for negotiation, but the seller usually pays because the issue relates to work done during their ownership. The cost is typically a one-off premium and will be shown as a disbursement on your conveyancing bill.

How long does a regularisation certificate take?

It depends on the council and the work involved. An inspection is needed, and the inspector may ask for parts of the work to be exposed or altered. It can take several weeks or longer, so start early if you can.

Will indemnity insurance cover the cost of fixing faulty work?

Usually not. A building regulations indemnity policy typically covers financial loss if the council takes enforcement action over missing approval. It does not normally pay to repair defects or make unsafe work compliant.

This guide is general information about the law in England and Wales as at the date shown above. It is not legal advice. Every property is different, so ask your conveyancer about your own situation. More in Conveyancing problems and how they're solved.

From the guides

Latest conveyancing guides

All guides